PROGRESS REPORT FYP2 (W13)
Week: 13
Date: 3rd May 2021 - 7th May 2021
Activity:
- Collecting results
- Writing Chapter 4
Objective:
- To get the results form the project
- To start writing Chapter 4 in thesis
Content:
- The new time delay has been set according to the rate of breathing
- 10bpm - delay: 16
- 15bpm - delay: 10
- 20bpm - delay: 8
- After changing the time delay, time taken for 10 cycles were recorded to measure its accuracy.

- Then, it was tested to rotate within a minute and the number of pumping were recorded according to the speed.
- Low: 10 pumping
- Medium: 15 pumping
- High: 20 pumping
Result:
Time taken for Low speed to complete 10 cycle is 58.62s, Medium speed is 39.36s and High speed is 29.10s.
Conclusion:
As a conclusion, the device is able to pump the ambu bag according tomthe rate of breathing of the patient.