PROGRESS REPORT FYP2 (W13)

Week: 13

Date: 3rd May 2021 - 7th May 2021

Activity: 

  • Collecting results
  • Writing Chapter 4

Objective:

  1. To get the results form the project
  2. To start writing Chapter 4 in thesis

Content:

  • The new time delay has been set according to the rate of breathing
    1. 10bpm - delay: 16
    2. 15bpm -  delay: 10
    3. 20bpm - delay: 8
  • After changing the time delay, time taken for 10 cycles were recorded to measure its accuracy. 

  • Then, it was tested to rotate within a minute and the number of pumping were recorded according to the speed. 
    1. Low: 10 pumping
    2. Medium: 15 pumping
    3. High: 20 pumping

Result: 

Time taken for Low speed to complete 10 cycle is 58.62s, Medium speed is 39.36s and High speed is 29.10s. 

Conclusion: 

As a conclusion, the device is able to pump the ambu bag according tomthe rate of breathing of the patient. 